A journey into the past
The historically valuable building, which was largely in its original state, was extensively modernised and renovated by the Federal Office for the Protection of Monuments in compliance with the specified guidelines.
At the beginning, we had the task of replacing damaged or missing floor boards true to the original - in total, we delivered around 200m² of historic floor boards in restored/prepared condition.
The floor construction was made according to traditional models with a wooden construction and was adapted with a water-bearing underfloor heating system.
Natural materials such as wood, clay and lime were used as far as possible.
Year 2022